
Press
Leviat press releases 2020
HALFEN press releases 2020

26.02.2020 - Reliable connection of steel to concrete
The new HALFEN Insulated connection, type HIT-SMV for reliable
connections
Langenfeld – (February 2020) The high thermal conductivity of the material between steel components and reinforced concrete slabs can easily become a critical weak spot in a façade. The new HALFEN HIT Insulated connections ensure reliable installation of steel balconies, canopies, shading systems and other façade elements. They provide effective thermal separation in connections, and consequently prevent...
Read more...
Langenfeld – (February 2020) The high thermal conductivity of the material between steel components and reinforced concrete slabs can easily become a critical weak spot in a façade. The new HALFEN HIT Insulated connections ensure reliable installation of steel balconies, canopies, shading systems and other façade elements. They provide effective thermal separation in connections, and consequently prevent...
Read more...
HALFEN press releases 2019

12.2019 - BASF Research Centre trusts HALFEN as a standardized support system
Ludwigshafen – (December 2019) – In March 2019, BASF opened a
pioneering Research Centre for catalyst and process engineering at
its Verbund Site at Ludwigshafen, Germany. To accommodate the
project, the more than 60-year-old building was completely stripped
and subsequently upgraded. The first of a total of 3 floors planned
for the project is...
Read more...
Read more...

17.06.2019 - Reliable connection of trapezoidal steel sheeting to concrete
The new self-anchoring HALFEN HTU-S Channels.
Langenfeld – (June 2019) – HTU Cast-in channels in beams or columns are ideal for attaching profiled metal sheeting using self-drilling or self-tapping screws. The technically advanced channels have become the standard solution for construction specialists. Because of its innovative design the new HTU-S Channel no longer requires welded anchors and is therefore even more economical...
Read more...
Langenfeld – (June 2019) – HTU Cast-in channels in beams or columns are ideal for attaching profiled metal sheeting using self-drilling or self-tapping screws. The technically advanced channels have become the standard solution for construction specialists. Because of its innovative design the new HTU-S Channel no longer requires welded anchors and is therefore even more economical...
Read more...

13.05.2019 - Fixing For Thin Large Sized Concrete Facade Elements
The FPA-SL30 system has been building authority approved since the
end of 2018
Langenfeld – (May 2019) – Thin, large sized concrete façade elements are more and more in the focus of architects. Their modern look and minimal thickness offer entirely new possibilities for building design. At the same time the innovative panels are proportionally lighter...
Read more...
Langenfeld – (May 2019) – Thin, large sized concrete façade elements are more and more in the focus of architects. Their modern look and minimal thickness offer entirely new possibilities for building design. At the same time the innovative panels are proportionally lighter...
Read more...

23.04.2019 - HALFEN ensures safety in elevator shafts
The new generation Halfen Lift-Box with additional load capacities
of 2,000 kg and 4,000 kg
Langenfeld – (April 2019) – Lift assembly without scaffolding is becoming more and more important today. To make installation and maintenance easier for lift technicians Halfen provide a solution in the HLX Lift-Box. Cast in the concrete of the shaft ceiling as an attachment point it ensures safe, temporary...
Read more...
Langenfeld – (April 2019) – Lift assembly without scaffolding is becoming more and more important today. To make installation and maintenance easier for lift technicians Halfen provide a solution in the HLX Lift-Box. Cast in the concrete of the shaft ceiling as an attachment point it ensures safe, temporary...
Read more...

14.01.2019 - Constant growth at HALFEN
Numerous product innovations and a digital marketing strategy
strengthen Halfen`s market position
Munich – (January 2019) – This year Halfen celebrates its 90th anniversary. Founded in 1929, the company received the first approval for the Halfen Cast-in channel – now a classic among anchor channels – in 1976...
Read more...
Munich – (January 2019) – This year Halfen celebrates its 90th anniversary. Founded in 1929, the company received the first approval for the Halfen Cast-in channel – now a classic among anchor channels – in 1976...
Read more...

14.01.2019 - New type of Punching Shear Reinforcement for foundations
The new Halfen HDB-Z Punching Shear Reinforcement allows an
increase in load-bearing capacity
Munich – (January 2019) – The larger the building, the greater the point shear load acting on the reinforced concrete slabs are. To prevent shear punching of the concrete slabs caused by the columns, punching reinforcement, usually consisting of double-head bolts or stirrup reinforcement, is used...
Read more...
Munich – (January 2019) – The larger the building, the greater the point shear load acting on the reinforced concrete slabs are. To prevent shear punching of the concrete slabs caused by the columns, punching reinforcement, usually consisting of double-head bolts or stirrup reinforcement, is used...
Read more...

14.01.2019 - Dry and permanent connections for precast concrete elements
Immediately static loadable connections with the Halfen HEK Precast
element coupler
Munich – (January 2019) – Fast, safe and permanent connection: The HEK Precast element coupler is suitable for various applications; for example installation of interior and exterior walls or shaft constructions and...
Read more...
Munich – (January 2019) – Fast, safe and permanent connection: The HEK Precast element coupler is suitable for various applications; for example installation of interior and exterior walls or shaft constructions and...
Read more...

14.01.2019 - HALFEN HVG VERSOGRID Installation grid – The versatile fixing system
The new fixing system ensures maximum versatility without
bolts
Munich – (January 2019) – Wherever there are large public venues, fixing systems are required for various service installation. With the new VERSOGRID Installation grid, Halfen provides a system for media and lighting installations...
Read more...
Munich – (January 2019) – Wherever there are large public venues, fixing systems are required for various service installation. With the new VERSOGRID Installation grid, Halfen provides a system for media and lighting installations...
Read more...
Press contact:
HALFEN GmbH
Marketing & Communication
Phone: +49 (0) 2173/970-0
Fax: +49 (0) 2173/970-256
E-Mail: kommunikation@halfen.com
HALFEN GmbH
Marketing & Communication
Phone: +49 (0) 2173/970-0
Fax: +49 (0) 2173/970-256
E-Mail: kommunikation@halfen.com