Informazione sulle referenze
Tempo di costruzione
:
2008-2011
Paese / Continente:
Hong Kong / Hong Kong / Asia
Categoria di prodotto:
Sistemi di fissaggio
Aree operative:
Curtain Wall
2008-2011
Paese / Continente:
Hong Kong / Hong Kong / Asia
Categoria di prodotto:
Sistemi di fissaggio
Aree operative:
Curtain Wall
Prodotti utilizzati
HTA - Profili HALFEN
al prodotto
al prodotto
Tamar Development Project
Hong Kong

The Tamar Development Project includes the design and construction of the new Government Headquarters, Legislative Council Complex, open space of about half the size of the entire Tamar site, and two elevated walkways. Construction works started in February 2008 and were completed in 2011.
The Tamar complex is one of the government´s greenest complexes with numerous environmentally friendly and energy-efficient features.
Besides the continuous technical support, HALFEN supplied hot-rolled cast-in channels, capable to resist fatigue loads, and accessories for the safe and durable attachment of double-layer ventilated facades.
The Tamar complex is one of the government´s greenest complexes with numerous environmentally friendly and energy-efficient features.
Besides the continuous technical support, HALFEN supplied hot-rolled cast-in channels, capable to resist fatigue loads, and accessories for the safe and durable attachment of double-layer ventilated facades.